Royal FloraHolland has announced road resurfacing works as part of its ongoing commitment to improving logistics at the location. The works form part of a broader effort to achieve future-proof infrastructure, centered on collaboration and innovation. All visitors and traffic users are asked to remain mindful of the situation and to follow the instructions provided on site.
During the works, the current orange DRS registration screens will be temporarily removed. A single temporary DRS registration post will be installed along the existing queuing lane in the center of the road. Traffic arriving to load or unload at a reserved dock should follow the light blue arrows to reach the temporary DRS registration post.
© Royal FloraHolland
For LMC traffic, reserving a dock will not be necessary during the two-week period of the works. Other traffic should follow the green route, for which registration is not required. Outgoing traffic will be temporarily diverted via car park P15. To help ensure traffic flows smoothly throughout the works, traffic marshals will be on site on weekdays between 11:00 and 16:00.
Trending Products
Benchmark Bouquets – Flowerin...
Perfectione Roses Preserved Flowers...
Sen Flora Preserved Flowers Bouquet...
CKLMMCZX Preserved Flowers Bouquet ...
KaBloom The Romantic Classic Red Ro...
lovenfold Flowers for Delivery Prim...
Stargazer Barn – Holiday Chee...
Benchmark Bouquets – Signatur...
Bloom’s Diary Preserved Flowe...